期刊文献+

基于项目相关方影响进度控制因素的辨识与分析 预览 被引量:4

Identification and Analysis on Controlling Factors of Progress from the Perspective of Project Stakeholders
在线阅读 下载PDF
收藏 分享 导出
摘要 对于一个工程项目,人既是项目的发起者,又是项目的参与者和执行者。文章从项目的直接参与者—人的角度,以人为本,通过分析项目的各种参与者在各个阶段对项目进度控制的影响,进而对工程项目进度控制的影响因素进行辨识,然后借助决策与试验评价实验室(DEMATEL)的方法,对影响进度控制的各种因素及其因素之间的影响关系进行分析,定量地揭示了各影响因素之间的综合相互影响程度,找出了影响进度控制的关键因素,为高效、可操作的进度控制提供了科学依据。 For a project,people are the project sponsors,and they are the project participants and executor.Through analyzing how the project participants influence the project controlling in every stage,this article find the controlling factors of the project from the perspective of the project direct participants-people.Then,by using the decision-making trial and evaluation laboratory (DEMATEL) approach,this paper analyzes the comprehensive influence and influenced degrees of each factor,and finds the key factors which influence the project controlling,in order to provide scientific basis for more effective and useful progress controlling.
作者 李冲 李志国 LI Chong1,LI Zhi-guo2 (1.School of Economics and Management,Tongji University,Shanghai 200092,China;2.School of Civil Engineering and Architecture,Shandong University of Science and Technology,Qingdao 130012,China)
出处 《华东经济管理》 CSSCI 2011年第10期 120-123,共4页 East China Economic Management
关键词 进度控制 决策与试验评价实验室(DEMATEL)方法 关键因素 progress control; DEMATEL approach; key factor;
作者简介 李冲(1985-),男,山东泰安人,博士研究生,研究方向:建设工程管理; 李志国(1985-),男,山西大同人,硕士研究生,研究方向:工程系统分析。
  • 相关文献

参考文献8

二级参考文献34

共引文献83

同被引文献28

引证文献4

二级引证文献2

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈
新型冠状病毒肺炎防控与诊疗专栏