岩滩水电站量水堰法观测大坝渗流的技术改进 预览

Technical Innovation of Measuring Weir Method in Observing Dam Seepage of Yantan Hydropower Station
在线阅读 下载PDF
收藏 分享 导出
摘要 岩滩水电站的大坝渗流量于1996年11月28日开始进行人工监测,共设置7个直角三角量水堰测点,2008年4月后,各测点的渗流量测值总体呈下降稳定趋势,各测点的流量均小于1 L/s,根据DL/T5178-2003《混凝土大坝安全监测技术规范》规定,三角量水堰只适用于流量为1~701 L/s,而容积法只适用于流量小于1 L/s,按规范要求必须将直角三角量水堰法改进为容积法,文章介绍了通过简单的技改,实现了两种观测渗流量方法可根据流量变化情况互相切换,方便了观测工作的操作,保证了渗流量观测数据的准确性。 The manual observation of dam seepage of the project started on November 28, 1996; there are 7 right angled triangle measuring points in total. After April of 2008, the measured values of each measuring point show stable downward trend, and the measured flows of each measuring point are lower than 1L/s. According to the provisions of "Technical Specification for Concrete Dam Safety Monitoring", the triangle measuring weir method is only applicable to the flow rate of 1~701 L/s, however, the volume method is only applicable to the flow rate less than 1L/s. Therefore, the triangle measuring weir method must be converted into volume method. Through simple technical innovation, the mutual conversion of the two methods is realized, facilitating the observation operations and ensuring the accuracy of observed data.
作者 颜文健 YAN Wenjian (Datang Yantan Hydropower Co., Ltd., Dahua, Guangxi, 530811 )
出处 《红水河》 2016年第2期76-79,共4页 Hongshui River
关键词 量水堰 大坝渗流量 岩滩水电站 measuring weir dam seepage Yantan hydropower station
作者简介 颜文健(1978),男(壮族),广西南宁人,高级工程师,学士,主要从事大坝观测、水工建筑物管理,E-mail:944125121@qq.com。
  • 相关文献

参考文献5

  • 1电力工业部.混凝土大坝安全监测技术规范[S].DL/T5178-2003.2003. 被引量:3
  • 2中国市政工程东北设计研究院.给水排水设计手册(第二版)[M].北京:中国建筑出版社,2006. 被引量:1
  • 3广西电力工业勘察设计研究院.红水河岩滩水电站设计报告[R].南宁:广西电力工业勘察设计研究院,1996. 被引量:1
  • 4河海大学.广西岩滩水电站大坝监测资料分析报告[R].南京:河海大学,2009. 被引量:1
  • 5国家能源局大坝安全监察中心.广西岩滩水电站大坝安全监测系统综合评价报告[R].杭州:国家能源局大坝安全监察中心,2015. 被引量:1

共引文献2

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈