大直径开口钢管桩竖向承载机理 预览

Vertical bearing mechanism of large-diameter open-ended steel pipe piles
在线阅读 下载PDF
分享 导出
摘要 大直径开口钢管桩因土塞形成闭塞效应以及挤土效应降低,其竖向承载机理远比预制混凝土打入桩复杂。以某港口工程大直径开口钢管桩试桩结果为基础,结合现行港口工程桩基规范,研究大直径开口铜管桩竖向承载机理,从受力和承载性状入手.分析大直径开口钢管桩桩径对闭塞效应、挤土效应降低对侧摩阻力、以及闭塞效应对桩端阻力的影响。 Due to the plugging effect and the discount of the soil squeezing effect, the vertical bearing mechanism of large diameter open-ended steel pipe piles is far more complex than that of precast concrete driven pile.Based on the results of the test piles project of large-diameter steel pipe piles of a certain harbor engineer, combined with the current cod for pile foundation of harbor engineering, this paper studies the vertical bearing mechanism of large diameter open-ended steel pipe piles.
作者 刘长健 LIU Changjian ( PDI Jinghua Engineer Management Co., Ltd., Beijing 100101, China)
出处 《水运工程》 北大核心 2017年第B05期41-44,48共5页 Port & Waterway Engineering
关键词 开口钢管桩 竖向承载力 挤土效应 闭塞效应 open-ended steel pipe pile vertical bearing capacity soil squeezing effect plugging effect
作者简介 刘长健(1968-),男,高级工程师,从事工程管理及监理工作。
  • 相关文献
投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈