盾构隧道施工引起的地基土超孔压特性模拟与分析 预览 被引量:1

Modelling Research and Analysis on Excess Pore Water Pressure Caused by Shield Tunneling
在线阅读 下载PDF
收藏 分享 导出
摘要 考虑盾构机盾壳与自重、开挖面正面推力、盾尾空隙、千斤顶推力和同步注浆等因素,利用有限元软件模拟研究了盾构施工过程引起的周边土体超孔压,并与实测值进行对比分析,以此验证了模拟方法的可靠性。基于单层软土、中等埋深条件下的盾构施工有限元模拟,分析了超孔压随施工过程的分布特性。研究表明,施工过程中周边土体的超孔压变化明显,随着盾构机的推进先不断增大,盾构机头到达或盾尾脱出时达到最大,盾构机离开后又逐渐减小。软土层中125 d后隧道四周超孔压的衰减率约为92%。 A 3 D FEM method is used to simulate the excess pore water pressure on the surrounding area caused by EPB(electric park brake) shield construction, with full consideration of factors like TBM(tunnel boring machine) shell and weight,shield face pressure,tail void,jack thrust and tail void grouting. The simulation result is compared with measured data to verify the reliability of the simulation. In addition, based on the 3 D FEM simulation of one layer soft soil in the medium depth tunnel construction, the distribution regularities of excess pore water pressure during tunneling is analyzed. The research shows that the excess pore water pressure changes sharply with the advance of EPB,it decreased by 92% in soft soil around the tunnel after 125 days.
作者 张冰清 宫全美 庄丽 ZHANG Bingqing;GONG Quanmei;ZHUANG Li;Guangdong Provincial Transportation Planning and Research Center;
出处 《城市轨道交通研究》 北大核心 2017年第11期9-13,共5页 Urban Mass Transit
关键词 盾构施工 超孔压 三维有限元 分布特性 shield tunneling excess pore water pressure three-dimensional finite element distribution character
作者简介 助理工程师
  • 相关文献

参考文献5

二级参考文献17

共引文献71

同被引文献8

引证文献1

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈