明朗水库大坝塑性混凝土防渗墙设计 预览 被引量:1

The Design of the Minglang Reservoir Dam Plastic Concrete Impervious Wall
在线阅读 下载PDF
收藏 分享 导出
摘要 大坝加固设计遵循的原则是在确保坝体稳定的前提下上堵下排,明朗水库大坝加固设计主要是:在坝体中部新建一道塑性混凝土防渗墙,坝基进行帷幕灌浆处理,下游坝脚设置排水棱体。坝体及坝基渗漏量小,上下游坝坡稳定,满足相关规程规范要求。 The dam reinforcement should be designed on the principle of blocking upstream and draining downstream on the premise of ensuring stability of the dam body. The reinforcement of Minglang reservoir dam is designed in such a way that a new plastic concrete impervious wall is built in the central section of the dam body, the dam foundation is treated by curtain grouting and a draining prism is provided at the downstream dam toe. As a result of this, seepage of both dam body and dam foundation significantly reduces and the upstream and downstream dam slopes become stable, thus satisfying the requirements of the related code and specifications.
作者 郑红 高志芹 ZHENG Hong, GAO Zhi-qin (PowerChina Kunming Engineering Corporation Limited, Kunming 650051, Yunnan, China)
出处 《云南水力发电》 2018年第5期139-142,151共5页 Yunnan Water Power
关键词 大坝 设计 塑性混凝土 防渗墙 dam design plastic concrete impervious wall
作者简介 郑红(1981),湖北石首人,高级工程师,主要从事水工结构工程设计工作。
  • 相关文献

参考文献1

  • 1陈祖煜著..土质边坡稳定分析 原理·方法·程序[M].北京:中国水利水电出版社,2003:563.

同被引文献13

引证文献1

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈