塘渣反压在垃圾填埋场局部滑移治理中的应用 预览

pplication of loading berm in landfill partial slip control
在线阅读 下载PDF
收藏 分享 导出
摘要 对国内处于填埋作业状态的某局部滑移堆体边坡开展塘渣反压控制工程实践,监测治理前、后的表面位移、深层水平位移和渗沥液水位,评估滑移治理效果.分析后续填埋作业塘渣反压高度和厚度要求.结果表明:采用塘渣反压后,表面位移速率最大值从130mm/d降为20mm/d,填埋堆体单次最大滑移面积从8994m2降为1645m2,深层最大滑移速率从5.3mm/d降为0.9mm/d.分析表明,在实施塘渣反压措施后,堆体现状局部稳定安全系数从1.129提高到1.614.当后续堆体继续堆高时,建议最小反压体高度应高于潜在滑移面的坡脚,最小反压体厚度应保证堆体稳定安全,反压体高度和厚度的最终取值应根据堆体的稳定性和反压工程的经济性进行优化. The loading berm method was used to control the partial stability of a domestic landfill in a state of work.The surface horizontal displacement,deep lateral displacement and leachate level before and after the treatment were monitored in order to evaluate the effect of the method.The height and thickness of loading berm for subsequent landfill operation was analyzed.The maximum surface slip rate reduced from 130 mm/d to 20 mm/d,the maximum single slip area reduced from 8 994 m 2 to 1 645 m 2,and the maximum deep slip rate reduced from 5.3 mm/d to 0.9 mm/d.The safety factor of the slope increased from 1.129 to 1.614.When the subsequent height of this waste slope continued to increase,the loading berm should be higher than the toe of potential sliding slope,and the minimum thickness of loading berm is enough to ensure safety.The ultimate height and thickness of loading berm are supposed to optimize according to the safety and economy.
出处 《浙江大学学报:工学版》 CSCD 北大核心 2018年第4期710-718,共9页 Journal of Zhejiang University(Engineering Science)
基金 国家自然科学基金青年基金资助项目(41502276) 浙江省科技计划资助项目(2015C03021).
关键词 填埋场 堆体局部滑移 稳定控制 塘渣反压 监测 landfill slope partial slip stability control loading berm field monitoring
作者简介 彭赵(1992—),男,硕士生,从事环境土工的研究.orcid.org/0000-0002-4920-0025,E-mail:peng_zhao@zju.edu.cn;通信联系人:兰吉武,男,副研究员,博士.orcid.org/0000-0001-6207-8565,E-mail:lanjiwu@zju.edu.cn
  • 相关文献

参考文献14

二级参考文献438

共引文献119

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈