熔断器预热转换装置的设计及其分断能力验证 预览

Design of fuse preheating conversion device and test of its breaking capacity
在线阅读 下载PDF
收藏 分享 导出
摘要 针对在大容量试验室进行熔断器分断能力试验测试过程中,因设备因素的限制存在试验时间不能满足分断能力测试要求的缺陷,该文设计预热转换装置中的低压大电流装置、转换高压装置、预热转换器 3 个重要部分,提出运用 PLC+PC 的自动控制方法监控和操作预热转换过程。测试结果表明:设计装置使得熔断器分断能力试验过程为 40 s,控制在 30~45 s 内,满足分断能力测试的要求,并且实现全程自动控制,降低试验设备被烧毁的风险,提高试验成功率,降低试验成本。 In order to solve the defect that the time was limited by equipment of breaking capacity test on fuse in the large-capacity laboratory, three importance parts of fuse preheating conversion device, large current lowvoltage device, conversion high pressure device and preheating conversion device were designed respectively, then use PLC+PC monitoring/operation to complete the preheating conversion program. The test results showed that the test time of the designed devices reach to 40 s could meet the requirements: 30 s to 45 s, the designed devices realized the whole process automatic control, reduced the risk of the test equipment being burned, improved the test success rate and reduce the test cost.
作者 牛小东 谢晓斌 谢晓玲 宋胜鹏 NIU Xiaodong;XIE Xiaobin;XIE Xiaoling;SONG Shengpeng(Gansu Province Key Laboratory of High-low Voltage Electrical Apparatus Inspection Technology,Gansu ElectricApparatus Research Institute,Tianshui 741018,China)
出处 《中国测试》 CAS 北大核心 2019年第5期116-120,共5页 CHINA MEASUREMENT & TESTING
关键词 熔断器 预热转换装置 分断能力测试 测试仪器设计 fuse preheating conversion device breaking capacity test design test instrument
作者简介 牛小东(1985-),男,甘肃天水市人,高级工程师,硕士,研究方向为电气设计和检验检测技术研究。