电缆隧道盾构区间下穿既有地铁施工技术 预览

Cable Tunnel Shield Tunnel under Existing Subway Construction Technology
在线阅读 下载PDF
分享 导出
摘要 地下盾构隧道施工将不可避免地引起邻近土体扰动,影响其上部结构及地面的隆起或沉降,北环电缆隧道盾构区间下穿段地铁3号线,对既有地铁隧道预加固,布设监测系统,盾构掘进过程中控制地表沉降,穿越通过后对穿越段管片背后进行补注浆处理,确保了既有地铁3号线的运营安全。 Underground shield tunnel construction will inevitably cause disturbance of adjacent soil, which will affect the uplift or settlement of the upper structure and the ground. The subway line 3 of the lower section of the shield section of the North Ring Cable Tunnel will be pre-strengthened, monitoring system will be laid, ground settlement will be controlled during shield tunneling, and grouting treatment will be carried out behind the segments of the crossing section after crossing to ensure the existing ones. Operation safety of Metro Line 3.
作者 吴发展 Wu Fa-zhan(不详)
出处 《建筑技术开发》 2019年第12期35-36,共2页 Building Technology Development
关键词 电缆隧道 盾构施工 土压平衡盾构 下穿地铁线 cable tunnel shield tunneling earth pressure balance (EPB) shield crossing underneath metro lines
作者简介 吴发展(1970-),男,河南沁阳人,髙级工程师,安全工程師,主要研究方向为土木工程施工技术与管理。
  • 相关文献

参考文献5

二级参考文献55

共引文献15

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈